EXPERIENCE LIST PT. ARTAWA INDONESIA |
|
||||
No |
Project Name |
Client |
Project Location |
Year |
||
1 | Daily Maintance at Smeleter Gresik | PT. Smelting,PT.OTE, PT SAE | Gresik | 1997 - Present | ||
2 | Steel Structure, Mechanical, Piping and Wrapping Work For Chandra Asri | PT JGC Indonesia | Cilegon | Juli 2020 - Present | ||
3 | Fabrication & Erection 2 Unit Tank Chilled Water and New Acrylic Acid Tank ( For Chandra Asri ) | PT JGC Indonesia | Cilegon | Jul 2020-Present | ||
4 | Fabrication 2 Unit Air Reciver Tank ( Inka Banyuwangi ) | PT. Adi Karya | Banyuwangi, East Java | May - Jun 2020 | ||
5 |
Fabrication 4 units Silencer, Support Skid, Test and etc |
PT. JEL/INC Engineering, Japan |
Batang |
Oct 2019-Mar 2020 |
||
6 |
Fabrication of Pipe Roller Horizontal & V Type |
PT. Chiyoda Saipem Tripatra SAE (CSTS) |
Gresik |
Oct-Nov 2019 |
||
7 |
Erection Steel Structure of Warehouse at WPI Mojokerto |
PT. Wilmar |
Mojokerto |
Oct-Des 2019 |
||
8 |
Fabrication of Piping Work 51.000 Dia Inch of NSI Project |
PT. Artha Teknik Abadi/IKPT |
Cilegon |
Aug 2019- Apr 2020 |
||
9 |
Feed Hopper SILO TAH-11 Repair of Shell Plate (SUS304) |
PT. Tifico Fiber Indonesia |
Tangerang |
Sept 2019 |
||
10 |
Overhaul Periodic every 2 year of Spinning Line 5 & 6 |
PT. Tifico Fiber Indonesia |
Tangerang |
Sept 2019 |
||
11 |
PFO Product Tank FB 1809 A dia 12.500 mm H 12.200 mm Roof Plate, Rafter and Accessories Replacement |
PT. Chandra Asri Petrochemical Indonesia |
Anyer, Banten |
April 2019 |
||
12 |
Fabrication & Transport of Intake Head 80 Ton |
Tokyo Kyuei, Japan |
Lamongan |
May-Oct 2019 |
||
13 |
AMG – C2 Utility Piping Work |
PT. Asahi Synchrotech Indonesia |
Cikampek |
May 2018-Jan 2019 |
||
14 |
Mechanical & Piping work on Process Area for Chocolate Factory |
PT. Asahi Synchrotech Indonesia |
Purwakarta, Bukit Indah Industri |
Jun 2018-Mar 2019 |
||
15 |
Fabrication of Intake Head and Circulation Pipe for Central Java & Tanjung Jati B line 5 & 6 for Power Plan |
Tokyo Kyuei, Japan |
Lamongan |
2017- Apr 2019 |
||
16 |
Fabrication of Steel Structure for Tangguh Project |
PT. Chiyoda Saipem Tripatra SAE (CSTS) |
Gresik, Artawa Worshop |
Jul 2018-Oct 2018 |
||
17 |
Tank Roof Replacement FB-1901 at PT. Chandra Asri Petrochemical Indonesia |
PT. Chandra Asri Petrochemical Indonesia |
Anyer, BAnten |
July 2018 |
||
18 |
Fabrication & Installation Furnace & Metal Bath for AMG-C1 Project |
PT. Asahimas Flat Glass Tbk |
Cikampek |
2015-2016 |
||
19 |
Assembly New Evaporator I unit (dia 6 m x 30 m) and Replacement New Lamela 3 units |
PT. Asahi Synchrotech Indonesia |
Muara Enim, Palembang |
May-Dec 2017 |
||
20 |
Remove of Tunel Booring Machine (TBM) 2 Unit, from Tunel to Outside and loading to Truck |
PT. SMCC |
Jakarta MRT at Setia Budi Station |
2017 |
||
21 |
Install TBM 2 unit |
PT. SOWJ |
Jakarta MRT at Patung Pemuda |
2015 |
||
22 |
Tunel Booring Machine Operation (Up/Down) line |
PT. SOWJ |
Jakarta MRT, from Patung Pemuda to Setia Budi Station |
2015-2017 |
||
23 |
Fabrication & Installation Conveyor at PT. Pusri, Palembang |
PT.Siko Eng./ PT. Adi Karya |
Cilegon & Palembang |
2015-2016 |
||
24 |
Fabrication Conveyor for Antam Pomala & Commissioning |
Sumitomo Heavy Industry |
Cilegon workshop, & Pomala |
2015-2016 |
||
25 |
Fabrication Conveyor for Antam Pomala & Commissioning |
Kawasaki Heavy Industry |
Cilegon workshop, & Pomala |
2015-2016 |
||
26 |
Piping work for Separation Tank Project |
PT. JX Noli |
MM2100, Cibitung |
2015 |
||
27 | Supply of frunace steel Fabrication, Dismantling & Erction | PT Muliaglass | Cikarang | 2014 | ||
28 |
Fabrication & Installation of Carrier for Barge at Slipway no 1 and no 2 for Tarakan New Shipyard Project |
PT. TOA |
Tarakan, Nort Kalimantan |
2014 |
||
29 |
Fabrication & Installation of 40 Units tank Project at PT. Indonesia Chemical Alumina (ICA) |
Tsukushima Japan |
Tayan, West kalimantan |
2014 |
||
30 |
Fabrication & Install Batching Plant and Power House Project |
PT. INCO |
Karebe, Suroako |
2013 |
||
31 | A2 Cold Repair : Furnace Metal Bath steel work,furnace metal Bath - Piping Work,Modification duct tank for additional WCB | PT Asahimas Flat Glass tbk. | Sidoarjo Factory | 2012 | ||
32 |
Fabrication & Erection 7 Units CRT & Piping work Project at PT Bumi Merak Tank |
PT. Bumi Merak Tank |
Merak, Banten |
2012 |
||
33 |
Sludge Oil Recovery (SOR) & Cleaning Tank FRT 6 units at PT Pertamina RU IV, Cilacap |
PT. Pertamina RU IV Cilacap |
Cilacap |
2008-2011 |
||
34 |
Fabrication of Stainless Steel Silo for Mitsubishi Gas Chemical, & 40 units SUS Tank for Mitsui, export to Singapore |
JGC / Mitsui |
Fabrication at Tanjung Priuk |
2010 |
||
35 |
Cleaning & Repair FRT (4 unit) at PT.Chandra Asri Petrochemical Indonesia |
PT.Chandra Asri Petrochemical Indonesia |
Anyer, Cilegon |
2010 |
||
36 |
Maintenance work at PT. INCO Karebe |
Kajima |
Kareba |
2009 |
||
37 |
Fabrication & Erection Silo at PT. INCO |
Kajima |
Karebe |
2008 |
||
38 |
Tank Cleaning & Tank Repair (FRT dia 45 M) 6 units at PT. INCO |
PT Indo Tahima Jaya |
Suroako |
2006-2007 |
||
39 |
Tank Cleaning, SOR, Tank Repair & New Ream Seal Replacement of FRT 300.000 Bbls 2 Unit |
PT. Chevron Indonesia |
Lawe-Lawe, Balikpapan |
2005-2006 |
||
40 |
Fabrication Intake Tower & Intake Pipe for Tarahan Power Plant |
Tokyo Kyuei Co. Ltd. |
Lampung |
2005 |
||
41 |
Fabrication & Erection Floating Roof Tank for Blue Sky Project at PT. Pertamina UP VI, Balongan |
PT. Rekayasa Indonesia |
Balongan |
2004 |
||
42 |
Piping work for Boiler Plant, Water tube type at PT. Bridgestone Tire Indonesia |
PT. Bridgestone Tire Indonesia |
Bekasi |
2003 |
||
43 |
Miwa’s Puzzle Type Parking Sustem |
Hanwa Co. Ltd. |
Workshop, Cilegon |
2002 |
||
44 |
Shutdown work & Installation |
PT. Bridgestone Indonesia |
Bekasi |
2001 |
||
45 |
Fabrication Ducting for JBR 2, export to Japan |
Futaba Manufacturing Co.Ltd. |
Fab at PT CHC, Suralaya, Cilegon |
2000 |
||
46 |
Fabrication of 29 Cone RoofTanks, export to Pulau Sakra, Singapore |
Mitsui Eng & Ship Bldg.Co.Ltd |
Fab. At Gresik Port |
1999 |
||
47 |
Fabrication Ducting for JBR 1, export to Kobe Japan |
Kobe Steel & Futaba |
Fab at PT CHC, Suralaya, Cilegon |
1999 |
||
48 |
Tower Repair Work of Showa Project |
Mitsubishi Heavy Industry |
Salira, Suralaya, Banten |
1998 |
||
49 |
Supporting Structure for 500KV-SP for Paiton Private Power Project Phase-1 |
Kokubu Work of Hitachi Ltd. |
Paiton, Pasuruan |
1998 |
||
50 |
Mechanical & Piping work at PT. Smelting |
PT. Chiyoda International Indonesia / PT. Smelting |
Gresik |
1997 |
||
51 |
Fabrication & Installation Furnace for AMG – A2 Plant Project |
PT. VDGI Co.Ltd / PT Asahimas Flat Glass Tbk |
Sidoarjo |
1997 |
||
52 |
Fab & Install of Hopper, Silo & Tank for Tifico Project |
PT. Chiyoda Internationa Indonesia / PT. Tifico Fiber Indonesia |
Tangerang |
1996 |
||
53 |
Fabrication SUS Alcohol Tower 4 units & Heat Exchanger 18 units |
PT.Indolampung Distillery / PT. Tiara Adi Lestari |
Fab. At PT. Puspetindo, Gresik |
1996 |
||
54 |
Fab & Install SUS Silo & Hopper for Bakrie Kasei Project |
JGC /PT. Bakrie Kasei Indonesia |
Merak, Banten |
1995 |
||
55 |
Fab & Install Silo & Thickener for Amoco Project |
PT. CII / PT. Amoco Mitsui PTA Indonesia |
Merak, Banten |
1995 |